Preliminary Option Installation Information
Preliminary Option Installation Information
- Attention - The
presence of 5 V ac standby power might result in damage to the hardware
unless you disconnect the power cord from the wall before you open the
server.
- Become familiar with the safety and handling guidelines specified under
Safety Information.
These guidelines will help you work safely
while working with the server and options.
- Make sure that you have an adequate number of
properly grounded electrical outlets for the server,
monitor, and any other options you intend to install.
- Place the server in a location that is dry. Rain or
spilled liquids might damage the server.
- Have a supply of 2 MB (1.44 MB formatted), 3.5-inch diskettes available.
- Back up all important data before you make changes to hard disk drives.
- Have a small, flat-blade screwdriver available.
- Attention - To
allow for air circulation, be sure to maintain the
following minimum clearances around the server:
- 102 mm (4 in.) in the front
- 127 mm (5 in.) in the rear
- 51 mm (2 in.) on the left and right sides
Before you begin:
- Be sure that the current server configuration is working properly.
- If you have not already done so, locate the keys to the cover lock.
At the time of shipment, two keys are attached to the back of the server, over
the keylock. Store the keys in a safe place. Duplicate or replacement keys
can be ordered from the Illinois Lock Company at 800-299-5880 or
http://www.illinoislock.com .
Caution:
When unlocked, the server door will not support the weight of the server.
To avoid personal injury, be sure to remove or lock the server door before
moving or lifting the server.
Use safe lifting practices when lifting the machine.