Before you begin to install optional hardware - (NF 8500R - Type 8681)
Before you begin to install optional hardware
Before you install any optional hardware in the server, thoroughly review the information in this section.
Also, review the power supply requirements described in 'Hot-swap power supply installation/removal'.
Before you begin installing options, be sure to do the following:
- Become familiar with the safety and handling guidelines specified in the Safety Information booklet,
and the requirements specified under 'Safety information' and
'Working inside a server with power on'.
These guidelines will help you work safely while working with the server or options.
- Read the information in 'System reliability considerations'.
- Make sure that you have an adequate number of properly grounded electrical outlets for the server,
monitor, and any other options that you intend to install.
- Place the server in a location that is dry. Rain or spilled liquids might damage the server.
- Leave sufficient space around the server to allow the server cooling system to work properly.
Refer to the server rack documentation, for example, IBM Netfinity 9308 Enterprise Rack Planning Guide ,
for additional information.
- Back up all important data before you make changes to disk drives.
- Have a small, flat-blade screwdriver available.
Lifting the server
-Caution- Use safe practices when lifting.
Back to
Please see the LEGAL - Trademark notice.
Feel free - send a
for any BUG on this page found - Thank you.