NETFINITY FIBRE CHANNEL - POWER ON/OFF PROCEDURE


Subject: NETFINITY FIBRE CHANNEL - POWER ON/OFF PROCEDURE
New Netfinity server RETAIN Tip: 

    Record number:       H201112
    Device:              D/T8681
    Model:               M
    Hit count:           UHC00000
    Success count:       USC0000
    Publication code:    PC50
    Tip key:             007
    Date created:        O99/12/17
    Date last altered:   A99/12/22
    Owning B.U.:         USA


Abstract: NETFINITY FIBRE CHANNEL - POWER ON/OFF PROCEDURE


TEXT:

Netfinity Fibre Channel - Power On/Off Procedure


PROBLEM ISOLATION AIDS:


DETAILS:

When applying or removing power, a certain order must be followed on the NetFinity Fibre Solution.

The Netfinity Fibre Controller requires that drives that are attached to it be available any time that it is powered up.
This means that a certain order must be followed when turning on or off power to the Fibre subsystem.

The Fibre Channel Hub, if installed, must be powered on before the host adapter in order to insure proper loop initialization.

It is suggested that the following information be attached to the Server in one or more places to ensure that servicers and operators follow proper powering sequence.

The power down procedure includes the following steps:

Turn off the Server (after proper NOS shutdown).
Turn off the Fibre controller.
Turn off Hub (if attached).
Turn off the Drives.

The power up procedure includes the following steps:

Turn on the Drives.
Turn on Hub (if attached).
Turn on the Fibre controller.
Turn on the Server.

Note: If you do not power up in the correct order, you could lose your configuration and then, as a result, possibly lose your data.